you'd never know that it didn't come with that engine in it from new just by looking, would you? superb job
Announcement
Collapse
No announcement yet.
Mk2 2.3 Duratec
Collapse
X
-
Electrickery
First update of the year.
Installation of the modified vehicle loom is now completed. The engine now cranks and the oil cooler circuit is primed and oil pressure has been achieved.
A few pictures of the boot, which is now complete.
Battery cable and loom from rear bulkhead
Engine bay picture with wiring loom, oil filter / cooler circuit and fuel hoses. Which looks very complicated and messy but it will not be seen when the throttle bodies and air filter are fitted.
The large hole next to the loom grommet is for the ECU loom which is not yet finished.
The ECU loom should be ready early March and the car running by Easter.
John
Comment
-
Originally posted by DAZZER View PostThat is one AWESOME car you have there, when do you hope to have it finished.
John
Comment
-
Originally posted by RS2000CUSTOM View PostNice detail on the spare wheel clamp (amongst other things - lol)
Do tell what you used or is it yet another bespoke item ?
http://www.ralloy.com/productdetail.asp?RALNo=RAL103A
John
Comment
Comment