The main hoop mounting plates and multi point mounting nuts are welded into place.
Uploaded with ImageShack.us
Uploaded with ImageShack.us
Because the 15" tubs are fitted I had to cut off the ends of the backstay bars including the welded tubes. I bought some new tube off Ebay and drilled the bars ready for welding in the new tubes.
Uploaded with ImageShack.us
Uploaded with ImageShack.us
I've made some backstay mounting plates from 2mm mild steel, drilled some washers ready to plug weld onto the brackets.
Uploaded with ImageShack.us
Uploaded with ImageShack.us
Uploaded with ImageShack.us
Just need to weld into place, make some support plates and do the same to the other backstay bar.
Uploaded with ImageShack.us
Uploaded with ImageShack.us
Because the 15" tubs are fitted I had to cut off the ends of the backstay bars including the welded tubes. I bought some new tube off Ebay and drilled the bars ready for welding in the new tubes.
Uploaded with ImageShack.us
Uploaded with ImageShack.us
I've made some backstay mounting plates from 2mm mild steel, drilled some washers ready to plug weld onto the brackets.
Uploaded with ImageShack.us
Uploaded with ImageShack.us
Uploaded with ImageShack.us
Just need to weld into place, make some support plates and do the same to the other backstay bar.
Comment