I started this today and my plan is to do away the wizz bang yb along with the elite 6 speed seqencial box and a 2.3 duratec with a tranx box to replace it all ready for a nice easy leasurely drive around the lakes in may
As you can see in pics when its all out theres some fabricating work to be carried out to the gearbox tunnel ,inner wings and front end
As you can see in pics when its all out theres some fabricating work to be carried out to the gearbox tunnel ,inner wings and front end
Comment